Project PTF Iassi: Design, Construction & Testing of Heating Subsystems.
- Details
- Category: Thermal Plastic Pyrolysis.
- Published: Saturday, 08 July 2017 14:51
- Written by Branimir
- Hits: 1219
PROJECT PTF Iassi - Serbesti: Design, Construction & Testing of Heating Subsystems.
Plastic-To-Fuel. Field Trip: Timisoara – Karpati (Vatra Dormea) - Iasi – Karpati (Vatra Dormea) – Timisoara. With Andjelka. New Pyrolyser Plant Development – TMUCB Iasi. Experimental Plant Development – Serbesti: UNIGAS Large, Bulgarian Medium (Spartak) Italian Small – Multi-Fuel Burners. Development of On-Site Laboratory. Design, Construction and Testing of Hot Air Generator, as well as of Pyrolytic Oil Conditioning System's Various Heating Subsystems. Iasi, Romanian Moldova, June 2014.