PROJECT. Steam Boiler ORO – Control System GESTRA. Inspection & Diagnose.
- Details
- Category: BMB and EPS (Expanded Polystyren) Production Plants Engineering.
- Published: Sunday, 29 October 2017 09:22
- Written by Branimir
- Hits: 1347
PROJECT. Steam Boiler ORO – Control System GESTRA.
Inspection & Diagnose
Steam Boiler Control System GESTRA FLOWSERVE With CAN Bus, CANopen Protocol
Burner Controller SIEMENS LMV51...Burner Control with integrated Fuel / Air Ratio Control and Load Control for Forced-draft Burners
Burner Controller SIEMENS LME 73.831.A2BC
Industrial Burner WEISHAUP RGMS60/2-A 800-6100 kW 160-543 kg/h. 2006.
Software Siemens ACS450 for AZL52.01A1WH of LMV51.100 B2
GESTRA
Electrodes & Controllers:
NRG 26-40 Level Electrode (Level Monitoring)
NRR 2-40 Level Controller (Level Monitoring)
NRG 16-40 Level Electrode (MIN Level Monitoring)
NRS 1-40.1 Level Control Unit (MIN Level Monitoring)
NRG 16-41 Level Electrode (MAX Level Monitoring)
NRS 1-41 Level Switch (MAX Level Monitoring)
LRG 16-40 Conductivity Electrode (Blowdown Control)
LRR 1-40 TDS Control Unit (Blowdown Control)
URB 1 Operating Terminal and Display Unit (FLOWSERVE Master Controller)